Our windfarm installation vessels (WFIV) are designed to operate in even the most challenging conditions, thanks to advanced specifications, high-quality equipment and experienced crews. We are sizing up for future demands, and in 2024 through 2026, our new purpose-built two P-class vessels, two A-class vessels, and "Nessie" and "Siren" will be ready to join the fleet. By that time, we will operate the largest and most capable fleet of jack-up installation vessels in terms of loading capacity and ability to transport, service and install offshore foundations and wind turbines (WTGs).
Vessels
Designed for the future of offshore wind
Vessels
Our vessels - designed for the future of offshore wind
Track record
Cadeler has many years of experience when
it comes to installing offshore wind farms. Here are our records achieved so far