Wind Zaratan
Details
Wind Zaratan is designed specifically to service the wind farm installation market in harsh operating environments. Wind Zaratan is a modified version of the MSC NG- 5500X design with a 2000 m2 main deck and an 800 t leg crane.
Wind Zaratan has an HSE accepted Safety Case in accordance with UK Offshore Installation (Safety Case) Regulations 2015.
Technical Info
- Self-Propelled
- DP2 capability
- Helideck
- 2000 m2 Main Deck Area
- Transit Speed 9.1 Knots
Global Operations
The vessel’s first engagement was at Gunfleet Sands Offshore Wind Farm, where Wind Zaratan facilitated Operations and Maintenance. O&M necessitates fast transits between sites, which was expedited by our self-propulsion and guidance systems.
Wind Zaratan displayed its versatility and extreme proficiency for monopile installation at Meerwind Offshore Wind Farm; the vessel was fitted with a 400 t Hydro Hammer and managed, at one stage, to drive 3 monopiles into the seabed in just 36 hours. Wind Zaratan worked in conjunction with Leviathan to erect 80 3.6 MW turbines.