Cadeler Wind Peak

Wind Peak

Wind Peak
P Class vessel (newbuild)

P Class vessels

By Q3 of 2024 and Q2 of 2025, our two new P Class vessels will be ready. The first P Class vessel to arrive will be named Wind Peak and the second Wind Pace.

Wind Peak and Wind Pace are designed to operate at some of the most difficult sites around the globe and with the most advanced equipment in the industry. The vessels will offer increased transit capacity, lowering the energy intensity of installation, reducing installation time and thereby lowering total cost of installing offshore wind farms.

With a deck space of 5,600m2, a payload of over 17,600 tons and main crane capacity of above 2,600 tons at 46 meters, the two new cyber-secure vessels are very attractive to the industry. The vessels will be able to transport and install seven complete 15MW turbine sets per load or five sets of 20+ MW turbines, cutting down the number of trips needed for each project, thus accelerating installation speed and minimizing the carbon footprint. The vessels can accommodate 130 people.

A deeper dive
Technical specifications
Download